This project consisted of the design and construction of a new church and fellowship hall for St. Elizabeth Ann Seaton Catholic Church. The new buildings were constructed within the existing campus which complicated the project. The Fellowship Hall was constructed first with reinforced masonry walls and a clear span steel bar joist and metal deck roof. The Church was constructed with reinforced masonry/cast concrete walls, while the roof was constructed with manufactured steel trusses and bar joists with metal deck. Due to space limitations, we had to design a 60" deep truss that spanned 97'-10" while limiting the deflection to acceptable levels. The project was completed on time and within budget.